See how advanced simulation enhances nuclear safety

Learn how the UNESCO Chair in Numerical Methods spearheads frontier innovation in the Global South

News

Back

BIGG project completed its 2nd year with a significant progress on the Standard Data Model for Buildings

Mar 21, 2023

In March 2023, the BIGG project has completed its second year with a significant progress on the Standard Data Model for Buildings, which aligns and harmonises various data sources. The data model also ensures consistent input for the Analytics Toolbox.

The objectives achieved thus far are:

  • Analysis of datasets, various formats, and ontologies to be incorporated into the BIGG solution.
  • Development of the BIGG Standard Data Model for Buildings.
  • Creation of data transformations and mappings to external data sources and ontologies, and linking the BIGG data model to the use cases tested in the pilots.
  • Contribution to the development of European standards and ontologies.

Building

The BIGG project conducted a comprehensive analysis of the data requirements of its use cases. In parallel, it analyzed the most relevant ontologies for building data, selecting appropriate structures, classes, and attributes to be reused in the BIGG data model. Subsequently, the initial BIGG Standard Data Model for Buildings was developed, including UML diagrams, definitions of classes, attributes, and enumerations (taxonomies), which cover the necessary input data for BIGG’s use cases.

Parts of existing ontologies, such as SAREF, SAREF4BLDG, ifcOWL, and BIMERR, were incorporated into the model to maximize semantic interoperability. Preliminary mapping to BEDES was also done. The available datasets supporting the use cases are currently being mapped to the BIGG data model. The final step in the development of the BIGG project’s data harmonization layer is to test the model’s effectiveness in real-world scenarios.

To achieve this, the pilot projects will be executed, and the data collected will be mapped to the BIGG data model. The results of these pilots will be analyzed to evaluate the effectiveness of the data model, and any necessary improvements will be made. Additionally, the data model will be continually updated to incorporate new data sources and ontologies, ensuring its relevance and usefulness as the project progresses.

Related News

CIMNE Launches DAMSHAI Project to Advance Dam Safety Through Artificial Intelligence
CIMNE Launches DAMSHAI Project to Advance Dam Safety Through Artificial Intelligence

The International Centre for Numerical Methods in Engineering (CIMNE) has launched DAMSHAI (Dam Structural Health Monitoring and Safety Assessment with an AI Agent), a three-year research project that will explore the application of artificial intelligence to critical...

Science meets Data: insights from UNESCO Chair seminar by Prof. Michael Ortiz
Science meets Data: insights from UNESCO Chair seminar by Prof. Michael Ortiz

  On 28 October, Professor Michael Ortiz gave a seminar entitled “Science Meets Data: Scientific Computing in the Age of Artificial Intelligence” at the Palau Robert in Barcelona, to mark his appointment as holder of the UNESCO Chair in Numerical Methods in...

CIMNE Showcases Seismic Simulation Advances and VR Innovation at Spanish Nuclear Society’s Annual Meeting
CIMNE Showcases Seismic Simulation Advances and VR Innovation at Spanish Nuclear Society’s Annual Meeting

  The 51st Annual Meeting of the Spanish Nuclear Society (SNE), held in Cáceres, reaffirmed itself as the key gathering of the nuclear sector in Spain. With 694 participants, 248 papers, 42 technical sessions, 23 exhibitors, and 31 sponsors and collaborators, the...

Tags