Research

Computational engineering to tackle global challenges.

Cimne menu projects

Discover our latest research projects

Innovation

Delivering tangible solutions for the benefit of all.

Cimne menu nuclear

See how advanced simulation enhances nuclear safety

Community

A thriving network of global innovators, thinkers, and life-long learners in numerical methods.

Cimne menu unesco

Learn how the UNESCO Chair in Numerical Methods spearheads frontier innovation in the Global South

About

We are a pioneering research and innovation centre in computational engineering, founded in 1987.

Cimne menu people

People at CIMNE: Meet the talent that makes it possible.

See how advanced simulation enhances nuclear safety

Learn how the UNESCO Chair in Numerical Methods spearheads frontier innovation in the Global South

News

Back

Emergency inflatable bridges arrives in Japan

Sep 10, 2020

Pneumatic Structures Technologies (PSTech), participated in by Buildair Ingeniería y Arquitectura, created by CIMNE professors about twenty years ago and recently the Catalan Institute of Finance’s part-owned, has sold the first unit of its inflatable bridge product for emergencies to the construction company Hirose Holdings, from Japan.

The photograph in the tweet below shows the bridge installed in front of Mount Fuji. Hirose will study the bridge’s applications in the Asian market and evaluate possible adaptations of the product to the needs and uses detected. This collaboration with Hirose may represent the beginning of a longer scientific and commercial collaboration between PSTech and Hirose.

The inflatable bridge was conceived at CIMNE as a response to the need to be able to install emergency bridges in a faster, cheaper way and with less logistical requirements than the traditional metal bridges used since the second World War. This innovative engineering product replaces the metal support structure of the traditional bridge with a low-pressure inflatable element that gives it a very similar strength and weighs 7 times less than a traditional bridge. Inflatable bridges reduce the resources needed for installation more than twenty times compared with a traditional one, with a tenth of the transport elements. Inflatable bridges installation does not require cranes, which makes it possible to respond to needs arising from natural disasters in an extremely rapid manner, overcoming the most critical moments after the disaster.

The bridge that was sold to Hirose is 16 meters long and a second unit, which is 32 meters long, has been built, making it more suitable for the usual needs, which will be tested this fall by the Military Emergency Unit (UME) of the Spanish Army. The UME has already tested the first bridge, with satisfactory results. In parallel, contact has been made with United Nations organizations (the International Search and Rescue Advisory Group) which will facilitate the introduction of the bridge between its member organizations in most countries in the world. 2021 must be the year of its commercialization.

Related News

In Memoriam of Carlos Agelet de Saracibar Bosch (1958-2026)
In Memoriam of Carlos Agelet de Saracibar Bosch (1958-2026)

Professor Carlos Agelet de Saracibar Bosch died in Barcelona on February 18th 2026, after a long fight with cancer. Carlos was one of my first doctoral students, and the first who had previously been an undergraduate student at the School of Civil Engineering of...

8M: Women Leading Industrial Innovation
8M: Women Leading Industrial Innovation

On the occasion of International Women’s Day 2026, we interviewed Dr Narges Dialami, professor at the Universitat Politècnica de Catalunya (UPC) and researcher affiliated with the Solid and Fluid Simulation for Industrial Processes cluster at CIMNE. Dr Narges Dialami...

Tags

Share: