Recerca

Enginyeria computacional per un món sostenible.

Cimne menu projects

Descobreix els nostres projectes de recerca

Innovació

Solucions reals per a problemes globals.

Cimne menu nuclear

Treballem amb simulació avançada per millorar la seguretat nuclear

Comunitat

Una xarxa global d’innovadors i emprenedors en mètodes numèrics.

Cimne menu unesco

Descobreix com la Càtedra UNESCO de Mètodes Numèrics lidera la innovació de frontera al Sud Global

Sobre Nosaltres

Des del 1987 som un centre de recerca i innovació pioner en enginyeria computacional.

Cimne menu people

Coneix el talent que ho fa possible.

Treballem amb simulació avançada per millorar la seguretat nuclear

Descobreix com la Càtedra UNESCO de Mètodes Numèrics lidera la innovació de frontera al Sud Global

Notícies

Enrere

Emergency inflatable bridges arrives in Japan

set. 10, 2020

Pneumatic Structures Technologies (PSTech), participated in by Buildair Ingeniería y Arquitectura, created by CIMNE professors about twenty years ago and recently the Catalan Institute of Finance’s part-owned, has sold the first unit of its inflatable bridge product for emergencies to the construction company Hirose Holdings, from Japan.

The photograph in the tweet below shows the bridge installed in front of Mount Fuji. Hirose will study the bridge’s applications in the Asian market and evaluate possible adaptations of the product to the needs and uses detected. This collaboration with Hirose may represent the beginning of a longer scientific and commercial collaboration between PSTech and Hirose.

The inflatable bridge was conceived at CIMNE as a response to the need to be able to install emergency bridges in a faster, cheaper way and with less logistical requirements than the traditional metal bridges used since the second World War. This innovative engineering product replaces the metal support structure of the traditional bridge with a low-pressure inflatable element that gives it a very similar strength and weighs 7 times less than a traditional bridge. Inflatable bridges reduce the resources needed for installation more than twenty times compared with a traditional one, with a tenth of the transport elements. Inflatable bridges installation does not require cranes, which makes it possible to respond to needs arising from natural disasters in an extremely rapid manner, overcoming the most critical moments after the disaster.

The bridge that was sold to Hirose is 16 meters long and a second unit, which is 32 meters long, has been built, making it more suitable for the usual needs, which will be tested this fall by the Military Emergency Unit (UME) of the Spanish Army. The UME has already tested the first bridge, with satisfactory results. In parallel, contact has been made with United Nations organizations (the International Search and Rescue Advisory Group) which will facilitate the introduction of the bridge between its member organizations in most countries in the world. 2021 must be the year of its commercialization.

Notícies relacionades

En record de Carlos Agelet de Saracibar Bosch (1958-2026)
En record de Carlos Agelet de Saracibar Bosch (1958-2026)

El professor Carlos Agelet de Saracibar Bosch va morir a Barcelona el 18 de febrer de 2026 després d’una llarga lluita contra el càncer. Carlos va ser un dels meus primers doctorands i el primer que prèviament havia estat alumne de l’Escola Tècnica Superior...

8M: dones que lideren la innovació industrial
8M: dones que lideren la innovació industrial

Amb motiu del Dia Internacional de les Dones 2026, hem entrevistat la Dra. Narges Dialami, professora de la Universitat Politècnica de Catalunya (UPC) i investigadora adscrita al clúster de Simulació de sòlids i fluids per a processos industrials del CIMNE. La Dra....

Etiquetes

Compartiu: